Pre-bid risk review for commercial electrical subcontractors.

Upload your drawings, specs and addenda. HVAX flags potential scope gaps and conflicts before you bid, each with a citation to the exact page.

Built for commercial electrical estimators and preconstruction teams.

The Problem

Bid windows are short.
Document sets aren't.

Commercial electrical estimators work under real pressure. Thorough document review competes with takeoff and pricing time — and review almost always loses.

01

Volume you can't read end-to-end

A single commercial bid can span hundreds of pages across drawings, specs, addenda, alternates, and supplemental documents. Reading everything is not a realistic option.

02

Contradictions across documents

Specs say one thing. Drawings say another. Addenda change something that wasn't updated elsewhere. These contradictions surface as disputes — or worse, unbilled work — after award.

03

Scope that isn't clearly defined

Vague interface language, undefined responsibilities between divisions, and unlisted equipment leave estimators guessing — and often underbidding work they'll be held to.

04

Late addenda buried in the stack

Addenda arrive after most of the estimate is built. A missed panel schedule revision or scope clarification can shift the job significantly and go unpriced.

05

Multiple bids, compressed timelines

Estimators are managing several active bids simultaneously. There's no slack in the schedule for a second, methodical pass through every document in a package.

06

One miss becomes a margin problem

A single missed requirement — a fire alarm interface, a temporary power obligation, an undefined commissioning scope — can cost more to address post-award than it would have cost to price correctly.

Cross-document review

Reads across your full document set — not one file at a time — to help surface inconsistencies.

Commercial electrical context

Understands Division 26 language, NEC requirements, switchgear, panel schedules, conduit systems, and bid document conventions.

Structured findings

Findings organized by type and severity — not buried in a wall of text. Each entry tells you what was found, where, and why it matters.

Fits your existing process

Designed for estimators who are already short on time. Integrates naturally without requiring a new, complex workflow.

Currently in private beta

A second set of eyes on every bid package

HVAX is purpose-built for commercial electrical contractors. Before a bid goes out, it works through your document package and surfaces the things that matter — the risks you didn't have time to find, the spec-drawing conflict buried on page 47, the addendum change that just shifted your scope.

  • Reviews ITBs, drawings, specifications, addenda, alternates, and scope requirements
  • Helps surface contradictions between documents
  • Flags potential scope gaps, missing requirements, and undefined interfaces for review
  • Flags critical items requiring estimator investigation
  • Recommends potential RFIs before submission
Request pilot
Coverage

What HVAX looks for

Six categories of issues that most often create bid risk, scope disputes, or unbilled work on commercial electrical projects.

Bid Risks

Liquidated damages, broad indemnification, undefined scope ownership, or one-sided responsibility transfer — conditions that create financial exposure before you've even started the job.

Contradictions

Conflicts between specifications, drawings, addenda, and the ITB — wire sizes, equipment ratings, installation methods, or scope boundaries that don't agree across documents.

Missing Requirements

Referenced work that isn't fully specified: commissioning, spare parts, submittals, testing and inspection, temporary power, startup services — scope that exists in the documents but not in the spec.

Scope Gaps

Interface work between divisions, unassigned coordination responsibilities, and equipment furnished by others with no installation scope defined — the grey areas estimators have to guess at.

Items to Investigate

Ambiguities, major addenda changes, complex notes, or unusual material requirements that warrant an estimator's direct attention, judgment, and manual review.

Potential RFIs

Design gaps, unresolved coordination issues, and ambiguities where a clarification before submission reduces your risk — identified and ready to issue before the bid goes out.

Pilot Case Study

Finding hidden risk before bid day

We ran the HVAX pipeline alongside a live estimating team to measure how many commercial and scope risks are missed during a standard manual review.

Client & Package Clark Electric, Inc. (Pilot User) Middle School Project (~888 pages, 4 Addenda)
Baseline Method Manual review by estimator Requires reading addenda and specs side-by-side
What HVAX caught
  • $150K exposure: Found a temporary-power allowance stated twice with conflicting wording across different sections.
  • Scope conflict: Spotted that Addendum 1 removed theatre lighting from the text, but the fixture package was accidentally left in the scope list.
  • Measured Impact: Generated 10 surfaced risks (4 Priority-1) and drafted 8 exact RFI-ready questions with verbatim page citations.
View the detailed sample report

Frequently asked questions

How does a subcontractor buy, pilot or test HVAX?
We are currently operating in a Private Beta. You can request a pilot, and we will run your active or historical bids through our pipeline to surface risks you may have missed. Pilot pricing is custom-tailored to your estimating volume.
What file types can I upload?
Standard PDFs. We process Instructions to Bidders (ITBs), Project Manuals (specifications), drawing sets, and addenda exactly as you receive them.
Is my bid data used to train AI?
No. We use commercial API agreements that strictly prohibit training foundational models on your documents. Your data is your intellectual property. Read our full data commitments on our Security page.
How long do you keep my documents?
By default, we permanently purge all project files 30 days after your final report is delivered, or immediately upon your request.
Does it replace my estimator?
Absolutely not. HVAX gives your estimating team a documented second set of eyes before the bid goes out. It does not replace estimator judgment, takeoff, or the Architect/Engineer's answer to an RFI. It simply surfaces the commercial and scope conflicts your estimator should know about before the number is set.
How accurate is it / what are the limits?
It does not promise to find everything. Where the documents are silent, the finding says so and does not guess. Because it can miss items, every single finding we deliver includes the exact source quote, its impact, and a specific action so your team can quickly verify the risk themselves.
How long does a review take?
Pilot reviews are delivered within 48 hours of document upload, giving your team plenty of time to review the findings, adjust your number, or submit RFIs.
Who's behind HVAX
Raghav Sharma

Raghav Sharma

Founder, HVAX

I built HVAX after seeing how much risk commercial electrical estimators carry on every bid due to compressed timelines and massive document sets. HVAX is designed to act as a tireless second set of eyes, surfacing hidden scope gaps and contradictions before the bid goes out.

LinkedIn founder@hvax.dev

Your bid documents

Get started

Interested in early access?

HVAX is currently operating in a curated Private Beta. If you are a commercial electrical estimator, request a pilot to reserve your spot.